Skip to main content
  • About AES
  • Distribution Distribution Distribution
  • Solutions Solutions Solutions
  • Generation Generation Generation
  • Community Community Community
  • Press
  • Contact Us Contact Us Contact Us
  • My AES
    Choose your location
    EN
    Choose location

    AES Global

    AES Local

    Andes Argentina Brasil Bulgaria Chile Colombia Dominicana El Salvador Hawai‘i Indiana México Miami Valley Lighting Ohio Panama Puerto Rico Vietnam
    Search
    Search AES

    Interconnections Portal to the Distribution network of Renewable Energy Generators

    Portada
    Portal InteReD

    Interconnections Portal to the Distribution network of Renewable Energy Generators

     

    AES El Salvador launches the Interconnection Portal to the Distribution network of Renewable Energy (InteReD), an online platform in which the users may request the interconnection of their generation plants to the distribution network, offering them a world class experience through a digital process that is efficient, precise, and agile.

    Through the InteReD portal you will be able to apply for the following: 

     

    Planta-Solar

    GDR

    Interconnection for Renewable Distributed Generation (GD): This service is addressed to generating users who wish to sell the total production of their renewable energy, injecting it (*) to the distribution network.
     

    (*) Conditions subject to pre-feasibility and feasibility studies.

    Casa-solar_0.png

    UPR

    Interconnection for End Users Renewable Energy Prosumer (UPR) This service is addressed to users with a generation capacity to supply their internal demand and who, in a temporary and exceptional condition, may inject (*) their surplus of renewable energy to the distribution network according to the current regulation.

    (*) Conditions subject to pre-feasibility and feasibility studies.

    How are the applications handled in the InteReD Portal?

    1. The application and documentation are presented by the user in the Portal.

    2. The application’s corresponding payment.

    3. A pre-feasibility and feasibility analysis of the application is performed.

    4. Technical analysis, documental review, and inspection processes that correspond are made.

    5. A resolution of the analysis is issued.

    6. The hiring is made through an automatized management process.

    7. Request to change the meter (if applicable).

    8. Change of meter and granting of operation permits.

    ENGLISH-PORTAL.jpg

    Throughout the management process, you shall receive automated information and feedback by the Interconnection Portal on the status of your application, as well as spaces to solve and concerns and comments. 

     

    Go to Portal InteReD and let’s accelerate the future of energy together

    Back to top

    Copyright © 2009-2023 The AES Corporation. All rights reserved. Terms of Use | Privacy

    Reproduction in whole or in part in any form or medium without the express written permission of The AES Corporation is prohibited. AES and the AES logo are trademarks of The AES Corporation. 

    About AES Distribution
  • CAESS
  • EEO
  • DEUSEM
  • Customer Service
  • Service to large customers
  • Solutions
  • Energy efficiency
  • Solar + storage
  • Automation and control
  • Design construction and maintenance
  • Studies and diagnoses
  • Insurances and assistance
  • Generation
  • Bósforo
  • Moncagua
  • Opico Power Plant
  • Nejapa Plant
  • Community
  • AES Rural Energy
  • AES Education
  • AES Environment
  • AES Women
  • AES Sustainability Report
  • Press Contact Us
  • Suppliers
  • Shareholders
  • Careers
  • Frequent questions
  • Places of interest
  • My AES
    Jump back to top